Push Back ALL manual test work

first previousindex nextlast
Slide 3 of 7

Push Back ALL manual test work

In a structured test process Test Design is performed parallel with the system development activities which moves this phase away from the critical path as much as possible: only test execution will always be on the critical path.

Most of the Test Design activities are done manually; taking a big bite out of the test budget.

More information about COVER.